Dear all, Here is a provisional agenda for the next RICH1 phone-in on Friday 8th February at 11:00 CET (10:00 UK time). It will have been be a month since the last meeting. The MDMS system and photon funnel are being discussed in separate weekly meetings so I will give only a brief status report. Note that the agenda and minutes of all previous meetings are linked to the INDICO web agenda:- http://indico.cern.ch/conferenceDisplay.py?confId=28059 Bill Cameron NB===> For people at CERN: Meeting room is now 2-1-034. ========================================================================== RICH1 - regular phone-in: Reserved phone meeting time: 11-13AM CERN time (CET). ****participants access code To join the call, do one of the following: a. Dial +41227676000 (Main) and enter access code 0113719, or b. To have the system call you, click here: https://audioconf.cern.ch/call/0113719 ========================================================================== I propose that we hear status reports from (or discuss) the following: 1. Magnetic Shielding 1.1 Securing the lower shield - Rolf/Dave 2. Gas enclosure 2.1 Nitrogen supply lines (Erich/Dave) 3. HPD assembly 3.1 Upper HPD box test installation and rail system mods- Dave/Bill 3.2 Lower HPD rail system - Rohan/Tony 3.3 Upper HPD box instrumentation and testing - Richard P 3.4 HPD cabling - Ken 3.5 Light leak detector - Richard P/Dave 3.6 Temperature monitors - Richard P 3.7 Time alignment laser - Richard P 3.8 HT safety interlock - Bill 4. HPD module installation and cabling. 4.1 Schedule for upper HPD installation - Richard P/Bill 4.2 Schedule for lower HPD delivery to CERN - Bill 5. Photon funnel 5.1 Design progress - Christophe 5.2 Quartz/Glass Gluing plans - Derek 5.3 Installation ideas? 6. Mirrors: Dust removal plans. 7. LAMS - Richard P 8. Magnetic distortion monitoring system - Ray 9. AOB Other items may be proposed - and there will not be time to have a full discussion of everything - the aim is to inform on status, identify problems and bottlenecks that need to be addressed, and an action list. Someone will circulate notes following the meeting. > A reminder: here is a list of the RICH1 work packages > > 1. Magnetic Shielding > 2. Gas Enclosure > 3. Quartz Windows > 4. VELO seal > 5. Exit Window / seal > 6. Spherical Mirrors > 7. Flat Mirrors > 8. HPD mechanics and cooling > 9. Radiators Aerogel and C4F10 gas > 10. Alignment, Monitoring & Control > 11. Handling tools > 12. Installation procedures > > > >