Again, in preparation for the WP meeting tomorrow, I have made brief summary of the estimated spend for each WP for FY06/07 (which Mike and I had to sent in to RAL yesterday). I hope this is not too out of line with your expectations. Cheers, Paul M&O = Consumables Requisitions = Equipment WP1 7.8 0.0 WP2 3.6 40.1 WP3 0.0 28.0 WP4 2.0 0.0 ==== ==== Total 13.4 68.1 where: o WP1 is 3.8k cables (already spent) plus 2 x 2.0k for laptops for Birmingham and RHUL. (Really WP5 but there is no separate budget code as this is the only expenditure of that WP.) o WP2 is 17.7k equipment (already spent) and 22.4k estimated spend plus 3.6k estimated consumables spend, as per Matthew's email o WP3 is 3.0k estimated equipment spend on a MAPS DAQ system plus 25k for the new fabrication process development o WP4 is 2.0k estimated consumables spend on licences and glue studies